Senior Supply Chain Manager
Senior Supply Chain Manager responsible for end-to-end hardware/robotic supply chain, BOM management, cost optimization, and team leadership in a SF Bay Area startup.
- On-site
- Min. 5 YOE
Senior Supply Chain Manager responsible for end-to-end hardware/robotic supply chain, BOM management, cost optimization, and team leadership in a SF Bay Area startup.
System Safety Consultant for part-time, on-site safety support and protocol development at Charge Robotics; focusing on risk assessment, safety infrastructure, and OSHA compliance in a robotic construction system.
Senior Electrical Engineer at Charge Robotics building electrical systems for robotic factory and deployment of solar farms.
Inventory & Shop Manager role at Charge Robotics in SF Bay Area; responsible for inventory systems, MES implementation, 5S, and workshop safety at San Leandro HQ.
Senior Mechanical Engineer for Charge Robotics in SF Bay Area, San Leandro HQ. Design and iterate mechanical systems for solar-assembly robots, travel to field ~10%, 4-5 days/week onsite.
R&D Engineering Technician at Charge Robotics (Electromechanical Assembly) in San Leandro, full-time.
First Manufacturing Engineer at Charge Robotics (SF Bay Area)
Senior Robotics Integration Engineer at Charge Robotics focusing on full-stack hardware/software integration for robotic factory deployments, with SF Bay Area relocation and travel to field sites.
Founding Lead Recruiter at Charge Robotics in SF Bay Area, leading the development of the talent function and end-to-end recruitment for a robotics startup.
Summer Engineering Intern at Charge Robotics, based in the SF Bay Area (San Leandro HQ) for 12 weeks in Summer 2026.
Charge Robotics is actively hiring as of April 2026, with 14 open roles across engineering, product, data.
Last updated April 10, 2026 at 2:14 PM UTC
Charge Robotics develops automation systems aimed at accelerating solar construction. By targeting the most labor-intensive tasks in site setup, equipment installation, and ongoing assembly, the company reduces manual labor requirements and project cycle times. The solution is designed to enable faster deployment of solar projects as demand for renewables grows, helping installers scale operations and improve consistency across sites.